Hill House, Colchester, Essex

Complete boiler house refurbishment consisting of:

  • Asbestos survey & removal

  • Cold water storage tank removal & conversion to boosted cold water & unvented hot water

  • Installation of new Grant high efficiency condensing oil boilers

  • Chimney re-lining with stainless steel flue liner & new flue system

  • Full plant room re-wire with new heating & hot water controls

  • Water softener 

  • Full system flush

  • All fully insulated with rock wool insulation and labeled   

Holmwood House School, Colchester. 

Full boiler room refurbishment by ourselves alongside Goodey Services removing 2 failed gas fired water heaters and replacing with 3x Rinnai high efficiency condensing water heaters, new pipe work and secondary return. Read our case study with Rinnai - https://bsee.co.uk/rinnai-continuous-flow-hot-water-replaces-stored-system-at-historic-essex-school/?utm_source=dlvr.it&utm_medium=linkedin

Block Automotive, Kessingland

We carried out a survey of a commercial workshop and worked alongside Powrmatic to size a new heater suitable for the customers requirements. Due to no gas supply in the premises we installed a 1800 litre bunded oil tank and a Kerosene oil fired CPX cabinet heater. Heater comes with its own built in energy saving controller and ERP rated fan. We installed a new stainless steel flue system and oil supply pipe work to feed the heater. All turned around promptly for our happy customer. 

Denny Bros, Bury Saint Edmunds.

Working alongside Goodey Services we removed a failed SIME open flue boiler and lochinvar gas fired water heater and replaced with an Ideal Evomax 2 High Efficiency condensing gas boiler with BOSS unvented hot water cylinder. We also installed a low loss header complete with air/dirt separation. We removed the old flue dilution system and upgraded the heating controls with EPH wireless thermostats to enable zoning each part of the building. Also carried out insulation of pipe work and flush of system. 

Hubert Farms, Colchester

We carried out a survey on our customers property where they were experiencing poor water pressure and issues with their current 25 year old combi boiler. They wanted a system that would work efficiently to provide good hot and cold water pressure throughout the property and cut their energy usage with the heating/hot water usage. We came up with a perfect solution.... The Viessmann 222-F Storage combination boiler alongside the Stuart Turner V200 mains boost. Where the current system was only supplying 40 degrees to all outlets @ 1.2 bar, it now supplies the property with 55-60 degrees @ 3 bar. With the heating now running on weather compensation, we commissioned the system to work at maximum efficiency reducing their gas bills by unto 23%! We also installed a new Aqualisa Digital shower so they could take full advantage of the new system. Very happy customer!  

Denny Bros, Bury Saint Edmunds

Read our case study on Powrmatic Website - https://www.powrmatic.co.uk/ca...

Selbourne Chambers, London

We were contacted by Selbourne Chambers to take a look at their current boilers as their heating had stopped working. They wanted to see if they can be repaired or if it would be financially beneficial to replace them. After attending site we found that boiler 2 had been capped off and parts had been removed and put onto boiler 1 to keep that going as they were no longer available. Boiler 1 required new thermocouples so we replaced them to get the back on. 

We then provided a quotation to replace the current boilers with new high efficiency condensing Ideal Evomax 2 boilers, header/frame kits, plate heat exchanger, flues and new controls. Out of 3 quotations we were by far the lowest for what we were providing. Quote was approved and works were booked in for when the heating season was over. 

We attended site, dismantled both boilers and removed them through a very tight loft hatch on the 5th floor. All new equipment was then lifted up through this loft hatch which was very tricky and heavy work! 

The new boilers were then installed on their premanufactured frames, manifold and plate heat exchanger was then fitted and interconnecting pipe work. Interlocks with gas slam shut valve provided, new controls and links into current system. Pipework flushed, dosed and commissioned with new insulation. 

All turned around in 7 days with minimal disruption. Another happy customer! 

Stalok Terminals, Mistley

We were contacted by James at Stalok stating that their current service provided had condemned their warehouse warm air heater due to a cracked heat exchanger. 

We were asked to provide a comparative quotation to replace the heater in which we turned around in record time and became the most competitive. 

The customer was very happy and we received the order for the works a returned the following week to replace their heater with a Powrmatic CPxO Oil Fired heater. 

Calor Gas, Saxham

Another one of our customers required their Byworth Steam Boiler to be stripped down and prepared for 5 Year NDT (Non-Destructive Testing) and Annual Insurance Inspection. 

We removed all sections of lagging where testing would be required, prepared the surfaces to remove surface rust/debris and cleaned ready for Inspector. We also removed all valves, manhole doors, safety valve, gauge cocks and water level sight glasses, re-packed all valves and painted. We also prepared the blowdown vessel for inspection. Boiler was stripped, prepared, inspected and re-assembled in 1 day to reduce downtime for our customer. 

Boiler was warmed up overnight and back up to working pressure the following afternoon and put back into service. We also serviced the burner while the boiler was stripped down and re-commissioned the following day.  

Ray, Clacton-on-Sea

We were contacted by Ray when his old halstead boiler stopped working and asked if we could attend to identify the fault. 

After attending we found out that the parts were no longer available for the boiler due to its age. We quoted to replace the boiler with a Glowworm high efficiency condensing boiler and attended the following week to replace. The system was flushed, dosed with inhibitor and commissioned with new magnetic filter to protect the boiler. 

Another satisfied customer.